Name of the Case Study

Brief Description of the case study

Author

Road Without Drain - A Great Disaster

Road Without Drain - A Great Disaster

Shri Nandanandan Das

Construction of R.O.B. Sevashram, Udaipur

Construction of R.O.B. Sevashram, Udaipur

Shri P.R. Chandak

Cast-in-situ of special span of 56.3 m with pre stressed concrete in Bangalore Metro

Cast-in-situ of special span of 56.3 m with pre stressed concrete in Bangalore Metro

Capt R.R. Doddihal

Carbon Critical Design: Comparison of RE wall and RC viaduct on the Benz Circle Flyover, Andhra Pradesh

Carbon Critical Design: Comparison of RE wall and RC viaduct on the Benz Circle Flyover, Andhra Pradesh

Mr. Adrian Anderson

Reconstruction of Major High Level Bridge Across River Painganga of Wadki-Wani Antargaon Gadchandpur-Dewada State Highway No. 236 in Chandrapur District

Reconstruction of Major High Level Bridge Across River Painganga of Wadki-Wani Antargaon Gadchandpur-Dewada State Highway No. 236 in Chandrapur District

Shri Ashish M. Chaphekar

Road Construction in Water Logged Highway Stretch-Nothing is Impossible-A Case Study

Road Construction in Water Logged Highway Stretch-Nothing is Impossible-A Case Study

Shri Nandanandan Das

Use of Seismic Reaction Block as a Horizontal Load Transferring Member from Superstructure of Substructure

Use of Seismic Reaction Block as a Horizontal Load Transferring Member from Superstructure of Substructure

Shri Sukamal Bhattacharya and Shri Sumantra Sengupta

Rajasthan Mega Highways Project

Rajasthan Mega Highways Project

Shri K. Ramchand and Shri Harish Mathur


Visitor No: - 344068