HUGE DISCOUNT ON IRC PUBLICATIONS

       

 

PACKAGE 1 :    DESIGN, CONSTRUCTION AND MAINTENANCE OF FLEXIBLE PAVEMENTS

 

Publication

No.

 

Title of the Document

 

Prices

Postage & Packing charges

 

IRC:14-2004

Recommended Practice for 2 cm Thick Bitumen and Tar Carpets (Third Revision)

100.00

20.00

 

IRC:16-2008

Standard Specifications and Code of Practice for Prime and Tack Coat (Second Revision)

80.00

20.00

 

IRC:20-1966

Recommended Practice for Bituminous Penetration Macadam (Full Grout)

100.00

20.00

 

IRC:27-2009

Tentative Specifications for Bituminous Macadam (Base & Binder Course) (First Revision)

200.00

20.00

 

IRC:37-2018

Guidelines for the Design of Flexible Pavements” (Fourth Revision) (with CD)

1400.00

40.00

 

IRC:47-1972

Tentative Specification for Built-up Spray Grout

80.00

20.00

 

IRC:55-1974

Recommended Practice for Sand-Bitumen Base Courses

80.00

20.00

 

IRC:81-1997

Tentative Guidelines for Strengthening of Flexible Road Pavements Using Benkelman Beam Deflection Technique (First Revision)

160.00

20.00

 

IRC:82-2015

Code of Practice for Maintenance of Bituminous Surfaces of Highways (First revision)

666.00

40.00

 

IRC:105-2019

Specifications for Dense Bituminous Macadam and Bituminous Concrete for Airfield Pavements (First Revision)

400.00

30.00

 

IRC:107-2013

Tentative Specifications for Bitumen Mastic Wearing Courses (First revision)

200.00

30.00

 

IRC:110-2005

Standard Specifications and Code of Practice for Design and Construction of Surface Dressing

100.00

20.00

 

IRC:111-2009

Specifications for Dense Graded Bituminous Mixes

300.00

20.00

 

IRC:115-2014

Guidelines for Structural Evaluation and Strengthening of flexible road Pavements Using Falling Weight Deflectometer (FWD) Technique (CD)

300.00

30.00

 

IRC:116-2014

Specifications for Readymade Bituminous Pothole Paching Mix Using Cut-Back Bitumen

400.00

30.00

 

IRC:121-2017

Guidelines for Use of Construction and Demolition Waste in Road Sector

300.00

40.00

 

IRC:SP:17-2019 Guidelines for Concrete Overlays on Concrete and Composite Pavements (First Revision)  600.00 30.00  

IRC:SP:53-2010

Guidelines on Use of Polymer and Rubber Modified Bitumen in Road Construction (Second Revision)

300.00

30.00

 

IRC:SP:78-2008

Specifications for Mix Seal Surfacing (MSS) Close-Graded Premix Surfacing (CGPS)

80.00

20.00

 

IRC:SP:79-2008

Tentative Specifications for Stone Matrix Asphalt

100.00

20.00

 

IRC:SP:81-2008

Tentative Specification for Slurry Seal and Microsurfacing

100.00

20.00

 

IRC:SP-98-2013

Guidelines for the Use of Waste Plastic in Hot bituminous Mixes (Dry process) in Wearing Courses

300.00

30.00

 

IRC:SP-100-2014

Use of Cold Mix Technology in Construction and Maintenance of Roads Using bitumen Emulsion

900.00

40.00

 

IRC:SP-101-2019

Guidelines for Warm Mix Asphalt

400.00

30.00

 

IRC:SP-107-2015

Guidelines for Gap Graded Wearing Course with Rubberized Bitumen-Rubber

340.00

40.00

 

MORT&H

Manual for Construction and Supervision of Bituminous Works, 2001

800.00

40.00

 

Seminar, 2006

(Technical Papers)

International Seminar on “Innovations in Construction and Maintenance of Flexible Pavement”, Agra, 2-4 September, 2006 Vol. -1 & Vol.-II Note: (For both Volumes Price in Rs.800.00)

1000.00

70.00

 

IRC:57-2018

Recommended Practice for Sealing of Joints in Concrete Pavements (Second Revision)

300.00

20.00

 

IRC-129-2019

Specifications for Open-Graded Friction Course

400.00

30.00

 

Total Rs.

10486.00

840.00

 

TOTAL AMOUNT OF PACKAGE-1

      

 

Amount of

Rs.

Discount

Total

Postage and Packing

Charges

Grand Total

Amount

Rs.

Total cost to members after 35% discount

9886

-3460

6426

810

7236

Total cost  to non members after 10% discount

9886

-988

8898

810

9708

 

     

 

PACKAGE 2 :    DESIGN, CONSTRUCTION AND MAINTENANCE OF RIGID PAVEMENTS

IRC:15-2017

Standard Specifications and Code of Practice for Construction of Concrete Roads (Fifth Revision)

1000.00

40.00

IRC:44-2017

Guidelines for Cement Concrete Mix Design for Pavements (Third Revision)

500.00

20.00

IRC:58-2015

Guidelines for the Design of Plain Jointed Rigid Pavements for Highways (Fourth Revision) (with CD)

868.00

40.00

IRC:60-1976

Tentative Guidelines for the Use of Lime-Flyash Concrete as Pavement Base or Sub-Base

60.00          

20.00

IRC:74-1979

Tentative Guidelines for Lean-Cement Concrete and Lean-Cement Fly Ash Concrete as a Pavement Base or Sub-Base

60.00

20.00

IRC:76-1979

Tentative Guidelines for Structural Strength Evaluation of Rigid Airfield Pavements

80.00

20.00

IRC:85-2015

Recommended Practice for Accelerated Strength Testing & Evaluation of Concrete for Road and Airfield Constructions (First Revision)

300.00

40.00

IRC:101-1988

Guidelines for Design of Continuously Reinforced Concrete Pavement with Elastic Joints

80.00

20.00

IRC:112-2020

Code of Practice for Concrete Road Bridges (First Revision)

1500.00

50.00

IRC:113-2013

Guidelines for the Design and Construction of Geosynthetic Reinforced Embankments on Soft Subsoils

700.00

30.00

IRC:114-2013

Guidelines for Use of Silica Fume in Rigid Pavements

200.00

30.00

IRC:117-2015

Guidelines for the Structural Evaluation of Rigid Pavement Falling Weight Deflectometer (with CD)

300.00

40.00

IRC:118-2015

Guidelines for Design and Construction of continuously Reinforced Concrete Pavement (CRCP)

300.00

40.00

IRC:122-2017

Guidelines for Construction of Precast Concrete Segmental Box Culverts

300.00

40.00

IRC:SP:46-2013

Steel Fibre Reinforced Concrete for Pavements

300.00

30.00

IRC:SP:49-2014

Guidelines for the Use of Dry Lean Concrete as Sub-base for Rigid Pavement (First revision)

400.00

30.00

IRC:SP:63-2018

Guidelines for the Use of Interlocking Concrete Block Pavement (First Revision)

500.00

30.00

IRC:SP:68-2005

Guidelines for Construction of Roller Compacted Concrete Pavements

160.00

20.00

IRC:SP-76-2015

Tentative Guidelines for Conventional, Thin and Ultra-Thin Whitetopping (First Revision)

600.00

40.00

IRC:SP:83-2018

Guidelines for Maintenance, Repairs & Rehabilitation of Cement Concrete Pavements (First Revision)

1000.00

60.00

IRC:SP-89-2010

Guidelines for Soil and Granular Material Stabilization Using Cement Lime and Fly Ash

300.00

30.00

IRC:SP-102-2014

Guidelines for Design and Construction of Reinforced Soil Walls

800.00

40.00

Seminar, 2004

Proceeding on “Design Construction and Maintenance of Cement Concrete Pavements”, New Delhi 8-10 October, 2004

100.00

20.00

Total Rs.

10408.00

750.00

TOTAL AMOUNT OF PACKAGE 2

      

 

Amount of

Rs.

Discount

Total

Postage and Packing

Charges

Grand Total

Amount

Rs.

Total cost to members after 35% discount

10408

-3643

6765

750

7515

Total cost  to non members after 10% discount

10408

-1041

9367

750

10117